TM 9-2350-222-20-1-3
ENGINE SHROUD REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
Position engine shroud (A) on engine.
Using socket, install 22 screws, washers, and new lockwashers (B) securing engine shroud (A) to
engine,
3.
Using socket and torque wrench, tighten 22 screws (B) to 20-30 lb-ft (27-41 N-m).
4.
5.
Install top deck (page 16-23).
TA140240
End of Task
9-3