TM 9-2350-222-20-1-3
ENGINE OIL COOLER FLUID PUMP CONNECTOR REPLACEMENT (2D ENGINE)
(Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
Inspection
Installation
--
TOOLS: 9/16 in. combination box and open end wrench
1/2 in. combination box and open end wrench
3/8 in. combination box and open end wrench
1-1/2 in. open end wrench (2 required)
3/4 in. combination box and open end wrench
Flat-tip screwdriver
Torque wrench with 3/8 in. drive (0-200 lb-in) (0-23 N-m)
3/4 in. socket with 3/8 in. drive
SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I)
SUPPLIES: Dry cleaning solvent (Item 54, Appendix D)
Rags (Item 65, Appendix D)
Gasket (8682679)
Washer (NAS1598-6V)
Nuts (MS21044-N5) (3 required)
TM 9-2350-222-10
REFERENCES:
LO 9-2350-222-12
PRELIMINARY PROCEDURE:
Go on to Sheet 2
TA139523
6-156