TM 9-2350-222-20-1-3
TRANSMISSION OIL COOLER REPLACEMENT (2D ENGINE) (Sheet 9 of 10)
15.
Remove drip pan or rags from under cooler
connectors.
16.
Remove plastic barrier material and masking
tape from ends of hose (M) and transmission
connector (N).
17.
Using 1-5/8 inch wrench to hold connector (N),
and using 1-1/2 inch wrench, install hose (M) to
transmission connector (N).
18.
Remove plastic barrier material and masking tape from ends of hose (P) and transmission
connector (R).
19.
Using 1-1/2 inch wrench, install hose (P) to
transmission connector (Q).
20.
Using rags, wipe up oil which may have
dripped or leaked during oil cooler
replacement.
21.
Remove cover from turbosupercharger air
inlet port.
Position clamp and air inlet hose onto elbow
22.
(R).
23.
Using screwdriver, tighten screw (S).
Go on to Sheet 10
TA139521
6-154