TM 9-2350-222-34-1
FINAL DRIVE REPAIR (Sheet 26 of 30)
59.
Using suitable lifting device, position final drive
(AG) on wood block.
60.
Using tape, cover threads on stud (AH) to
prevent thread damage during assembly.
61.
Position crowbar between studs (AH) to prevent
output shaft (A) from turning and to stabilize final
drive (AG).
62.
Position special box wrench on nut (AF). Attach
PD 1201 torque wrench to box wrench.
CAUTION
Do not rest reactor bar against pinion
gear (AB). Damage to gear will result.
63.
With reactor bar supported against wood block,
apply 1100-1500 lb-ft (1492-2034 N.m) torque to
nut (AF).
64.
Wait one minute. Apply torque again.
65.
Continue to apply torque until reading stabilizes
between 1100-1500 lb-ft (1492-2034.N m).
Go on to Sheet 27
Change 3 7-26