UNIVERSAL JOINT REPLACEMENT (Sheet 4.2 of 7)
INSTALLATION:
Position final drive flange (A) to universal
joint (B).
2. Using 13/16 inch socket, install four
screws (C).
3. Using torque wrench, tighten four screws (C)
to 110-130 lb-ft (146-173 N. m).
4 . Using slip joint pliers, install lockwires (D)
to each two adjacent screws (C) (page C-39).
Go on to Sheet 5