TM 9-2350-222-20-1-4
UNIVERSAL JOINT REPLACEMENT (Sheet 1 of 7)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Inspection
Installation
Thickness gage
TOOLS: 13/16 in. socket with 1/2 in. drive
Oxy-acetylene welding equipment
2 in. extension with 1/2 in. drive
10 in. flat file
3/4 in. socket with 1/2 in, drive
Socket wrench handle with 1/2 in. drive
1-1/2 in. open end wrench
Torque wrench with 1/2 in. drive
(0-175 lb-ft capacity) (0-237 N. m)
Diagonal cutting pliers
Slip joint pliers
Alining punch
Pinch bar
Crowbar
Hammer
Screwdriver
92 lb. minimum capacity hoist
92 lb. minimum capacity rope
SPECIAL TOOLS: Center punch (Figure F-9, Appendix F)
Paint brush (Item 77, Appendix D)
SUPPLIES: Lockwire (Item 59, Appendix D)
Brazing alloy (Item 78, Appendix D)
Dry cleaning solvent (Item 54, Appendix D)
Welding flux (Item 79, Appendix D)
Rags (Item 65, Appendix D)
Industrial goggles (Item 74,
Rubber gloves (Item 73, Appendix D)
Appendix D)
Paint brush (Item 10, Appendix D)
Rope (Item 64, Appendix D)
Two
PERSONNEL:
TM 9-2350-222-10
REFERENCES:
LO 9-2350-222-12
PRELIMINARY PROCEDURES: Remove top deck (page 16-21 )
Remove transmission shroud support (page 9-38)
Remove exhaust pipe (page 8-5 or 8-9)
Block both tracks front and rear, place transmission selector lever
in neutral (N), and make sure brake is released so transmission
output flange can be turned to loosen all four screws
(TM 9-2350-222-10)
Pull transmission mounting guide toward rear (page 6-10)
Go on to Sheet 2
12-11
Change 5