TM 9-2350-222-20-1-4
BILGE PUMP RELAY ENCLOSURE ASSEMBLY REPAIR (Sheet 2 of 12)
Circuit Breaker Replacement (Sheet 2 of 3)
3. Using socket, remove screw (F) with two
4.
Using socket, remove nut (G) with
lockwasher holding bus bar (H). Throw
lockwasher away.
5.
Remove bus bar (H).
6.
Using socket, remove screw (J) with
lockwasher. Throw lockwasher away.
7.
Remove lead (K).
8.
Using screwdriver, remove two screws (L) with flat washers and lockwashers. Throw lockwashers
away.
9.
Remove circuit breaker (M).
CLEANING AND INSPECTION:
1.
Inspect circuit breaker for corrosion. If corroded areas cannot be cleaned using crocus cloth (Item
14, Appendix D) or steel wool (Item 55, Appendix D), replace circuit breaker.
2.
Inspect for mechanical damage or wear. If damaged or worn, replace circuit breaker,
Go on to Sheet 3
TA139746
10-191