TM 9-2350-222-20-1-3
TURBOCHARGER SHROUDS REPLACEMENT (Sheet 4 of 6)
Inner Shroud Replacement (Sheet 4 of 4)
11. Install transmission oil cooler lines (pages 6-132 or 6-136).
12. Ground hop engine (page 5-49) and check for oil leaks.
14. Disconnect engine from powerplant test run hookup (page 5-62).
16. Install 2A powerplant (page 5-14) or 2D powerplant (page 5-37).
End of Task
9-16