TM 9-2350-222-20-1-3
TRANSMISSION SHROUD REPLACEMENT (Sheet 1 of 7)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
Installation
TOOLS:
3/4 in. socket with 1/2 in. drive
1-1/8 in. socket with 1/2 in. drive
7/16 in. combination box and open end wrench
SUPPLIES: Plastic covers for exhaust (2 required)
PERSONNEL: TWO
WARNING
Allow engine to cool one hour before removing shroud. Wear
asbestos gloves for protection against burns.
Go on to Sheet 2
9-19