TM 9-2360-222-20-1-3
TURBOCHARGER SHROUDS REPLACEMENT (Sheet 5 of 6)
Outer Shroud Replacement (Sheet 1 of 1)
TOOLS:
1/2 in. combination box and open end wrench
1/2 in. socket with 1/2 in. drive
SUPPLIES: Self-locking nut (503345)
PRELIMINARY PROCEDURES: Remove powerplant (page 5-1)
REMOVAL:
NOTE
Procedures for replacement of the left or right turbocharger
shrouds are similar. Procedures for the left side are shown.
Using 1/2 inch socket and 1/2 inch wrench,
1.
remove four screws and self-locking nuts (A)
securing outer shroud (B). Throw self-locking
nuts away.
Remove outer shroud (B).
2.
INSTALLATION:
Position outer shroud (B) to turbocharger.
1.
2.
Install four screws and new self-locking nuts (A) to secure outer shroud (B) to turbocharger.
3.
Using 1/2 inch socket and 1/2 inch wrench, tighten screws (A) and (B).
Install 2A powerplant (page 5-14) or 2D powerplant (page 5-37).
4.
TA140253
End of Task
9-17