TM 9-2350-222-34-1
ACCELERATOR CONTROL LINKAGE ASSEMBLY REPAIR (Sheet 11 of 13)
13. Slide lever (T) onto shaft (V). Line up pin holes.
14. Using pliers, insert pin (W) into lever (T).
15. Using hammer and punch, install pin (W) into lever (T) and shaft (V).
16. Install shaft (V), lever (T), and pin (W) into riser housing (S) as an assembly.
17. Using hammer, tap lever (X) onto shaft (V) until lever and shaft pin holes line up.
18. Using pliers, insert pin (Y) into lever (X).
19. Using hammer and punch, install pin (Y) into lever (X) and shaft (V).
Go on to Sheet 12
TA130577
4-121