TM 9-2350-222-20-2-3-2
31.1-3
LOADER'S SAFETY SWITCH ASSEMBLY AND GUARD INSTALLATION PROCEDURE
3/4 in. socket (1/2 in. drive)
TOOLS:
7/16 in. open end wrench
PERSONNEL One
JPG for procedure to connect electrical connectors
REFERENCES:
TM 9-2350-222-10 for procedure to do firing circuit test
EQUIPMENT LOCATION INFORMATION:
CALLOUT
FOLDOUT
EQUIPMENT
6
165-mm Gun
11
Driver's Master Control Panel
Driver's master control panel MASTER BATTERY switch set to OFF
EQUIPMENT CONDITION:
PROCEDURE
Line up mounting holes in plate (1) and loader's guard (2) with mounting holes in gun mount (3).
Using socket, attach plate (1) and loader's guard (2) to gun mount (3) with three screws (4) and three
Connect three electrical connectors (6) (JPG).
Using wrench, attach ground strap (7) to gun mount (3) with screw (8), and two lockwaahers (9).
NOTE
Follow-on Maintenance Action Required:
Test firing circuit (TM-10).
Para 31.1-3
31.1-4 Change 1