TM 9-2350-222-20-1-5
(Sheet 1 of 2)
TOOLS: Spanner wrench
Slip joint pliers
PERSONNEL: Two
REFERENCE: TM 9-2350-222-10
PRELIMINARY PROCEDURES: Disconnect battery ground straps (page 10-283)
Traverse turret to gain access to bulkhead connectors
REMOVAL:
(TM 9-2350-222-10)
1.
Pull apart connectors (A) and (B).
3.
Using slip joint pliers, back off nut (D) from
plug assembly (E).
4.
Pull out wire and pin (F) from location `A' in
plug assembly (E).
Remove and throw away lead (F).
5.
INSTALLATION:
1.
Thread replacement lead (A) through nut (B).
2.
Insert lead (A) pin into position `A' in plug
3.
Using slip joint pliers, tighten nut (B) onto plug
assembly (C).
TA140862