TM 9-2350-222-20-1-4
STEERING CONTROL INTERMEDIATE LINK ASSEMBLY REPAIR (Sheet 1 of 1)
TOOLS: Hand hammer
Brass bar 11/16 in. diameter
Vise
REFERENCE: TM 9-214
PRELIMINARY PROCEDURE:
DISASSEMBLY:
1.
Inspect bearing (A) (TM 9-214). RepIace if required.
NOTE
If bearing is to be replaced, perform step 2.
2.
Using hammer and brass bar, drive bearing from link from top or bottom of link.
ASSEMBLY:
1.
Using vise, press bearing (A) in link (B) flush with both sides of link.
2.
End of Task
15-24