MWO 9-2350-372-23-1
Not applicable.
12. WEIGHT AND BALANCE DATA
Weight and balance are not significantly affected.
13. QUALITY ASSURANCE REQUIREMENT
The following information is supplied to ensure the proper application of this modification and provide
clarification in regards to the adequacy of the installer's inspection methods and procedures applicable to
quality assurance. The procedures include, but are not limited to, installer responsibilities, government
verification, and in-process and workmanship inspections. Inspections shall be in accordance with
TM 750-245-4.
The installer is responsible for compliance with quality assurance requirements specified herein. These
requirements and the installer's plan of inspection, or quality assurance program, constitute the minimum
examinations and test necessary to ensure compliance with established requirements. The requirements
contained in this MWO shall include the installer's plan or quality program. Specific installer responsibilities
for this MWO are as follows.
a. Installation. The installer is responsible for following the instructions contained in this MWO for
installing the JCAD mounting hardware on the FAASV.
b. Removal. The installer is responsible for following the instructions contained in this MWO for removing
all components applicable to the M43A1 NBC detector mounting hardware from the FAASV.
c. Notification. The installer is responsible for notifying the Government Point of Contact or representative
if kit is received incomplete, opened, or damaged.
d. Quality and Safety. The installer is responsible for observing all quality and safety standards.
e. Final Inspection Requirements. The installer is responsible for performing the following final
inspection.
(1) Mount. Check JCAD mount is properly installed and secured.
(2) Cable. Check JCAD cable assembly 12529157 is properly connected and secured.
(3) Interface kit. Check JCAD interface kit is properly installed and secured.
13