TM 9-2350-222-20-1-4
SHIFT LINKAGE ADJUSTMENT (Sheet 10 of 20)
59. Using 9/16 inch wrench, adjust shifting rod
bearing end (AN) by turning clockwise or
counterclockwise until screw (AM) drops free-
ly through clevis (AP) and shifting rod bear-
ing end (AN).
60. Using 9/16 inch wrench, install screw (AM).
61. Using crowfoot and torque wrenches, tighter.
jamnut (AE) to 15-20 Ib-ft (20-27 N.m). Re-
move locating pin from alinement hole (AC).
62. Using 9/16 inch socket and torque wrench, tighten screw (AM) to 15-20 lb-ft (20-27 N.m) and go to
step 73.
63. Using 9/16 inch wrench, remove screw (AM).
64. Using 9/16 inch wrench, adjust shifting rod bearing end (AN) by turning clockwise until shifting rod
(AJ) is past hole (AL).
65. Using 9/16 inch wrench, install screw (AM).
66. Using crowfoot and torque wrenches, tighten jamnut (AE) to 15-20 lb-ft (20-27 N.m).
67. Using 9/16 inch socket and torque wrench, tighten screw (AM) to 15-20 lb-ft (20-27 N.m).
Go on to Sheet 11
TA253369
Change 1 11-11