TM 9-2350-222-34-1
SHIFTING CONTROL BULKHEAD LINK REPLACEMENT (Sheet 2 of 2)
INSPECTION:
1. Inspect nut, washers, and link for wear or damage.
2. Replace worn or damaged parts.
INSTALLATION:
1. Assemble link (A), washers (B), and washer
(C) on stud (D).
2. Using wrench, install nut (E).
3. Using pliers, install new cotter pin (F) in
nut (E) and stud (D).
4. Install two bolts (G).
5. Using socket and torque wrench, tighten
two bolts (G) to 15-20 lb-ft (20-27 N.m).
222-20-1).
End of Task
TA252635
Change 1 6-8