TM 9-2350-222-20-2-3-2
NYLON BALLISTIC SHIELD INSTALLATION PROCEDURE (CONT)
33-3.
FRAME 1
PROCEDURE
STEP
Starting at right side of gun mount, work nylon ballistic shield (1) over gun mount until holes in shield
1.
are lined up with attaching studs on turret.
NOTE
Do not install nuts where M240 machine gun deflector plate is to be
installed.
Put twenty-three metal clips (2), flat washers (3), and nuts (4) on turret studs.
2.
U s i n g 9/16 inch socket wrench with extension, t i g h t e n t w e n t y - t h r e e n u t s ( 4 )
3.
holding ballistic shield (1) to turret.
Line up holes in ballistic shield (1) with holes in gun mount.
4.
NOTE
Metal strips holding ballistic shield to gun mount have part
numbers stamped on them as follows:
Top and bottom strips -10916201
Side strips -10916200
Corner strips -10916199
5.
Put in eight metal strips (5), sixteen flat washers (6), sixteen lockwashers
( 7 ) , and sixteen screws (8) holding ballistic shield (1) to gun mount.
6.
Using 7/16 inch socket wrench with extension, tighten 16 screws (8) to gun mount.
Join split at lower left of ballistic shield (1) by putting loops through holes.
7.
Put nylon lacing (9) through all loops except last loop. Insert lacing back through last two loops, as
8.
shown.
NOTE
Follow-on Maintenance Action Required:
Install M240-machine gun deflector plate (if equipped) (para 36-12)
Install 7.62-mm machine gun (TM-10).
Install 7.62-mm spent cartidge case bag (TM-10).
Install Ml 05F telescope (para 57-3). TM 20-2-3-3
Notify support personnel to install ballistics drive temperature
compensating link and ballistics drive trunnion link.
END OF TASK
Para 33-3 Cont
33-8 Change 1