TM 9-2350-222-20-2-3-2
CHAPTER 33
NYLON BALLISTIC SHIELD
33-1.
MAINTENANCE PROCEDURES INDEX
Tasks
Removal
Installation
Equipment Item
Nylon Ballistic Shield
33-2.
NYLON BALLISTIC SHIELD REMOVAL PROCEDURE
TOOLS:
7/16 in. socket (3/8 in. drive)
9/16 in. socket (3/8 in. drive)
5 in. extension (3/8 in. drive)
PERSONNEL One
REFERENCE:
TM 9-2360-222-10 for procedures to:
Remove 7.62-mm spent cartridge case bag
Remove 7.62-mm machine gun
Position 166-mm gun level
EQUIPMENT LOCATION INFORMATION:
CALLOUT
FOLDOUT
EQUIPMENT
11
Driver's Master Control Panel
EQUIPMENT CONDITION:
Driver's master control panel MASTER BATTERY switch set to OFF
7.62-mm machine gun removed (TM-10)
7.62-mm spent cartridge case bag removed (TM-10)
165-mm gun level (TM-10)
PRELIMINARY PROCEDURES:
Remove M105F telescope (para 57-2) TM 20-2-3-3
Remove M240 machine gun deflector plate (if equipped) (para 35-1 1
GENERAL INSTRUCTIONS:
NOTE
Notify support personnel to remove ballistic drive trun-
nion link and ballistic drive temperature compensating
link.
Para 33-1
Change 1 33-1