TM 9-2350-222-20-1-5
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 6 of 9)
Top Deck Insulator Panel Replacement (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
7/16 in. socket with 1/2 in. drive
9/16 in. socket with 1/2 in. drive
Drift pin
Hoist (capable of lifting 3,000 pounds)
SPECIAL TOOLS: Sling (Item 31, Chapter 3, Section I)
PERSONNEL: Two
REMOVAL:
1.
Using 7/16 inch socket, remove seven screws
(A) and tabs (B) from aluminum frame (C).
2.
Fasten two hoist chains to end (D) of top
deck (E).
3.
Using hoist, raise end (D) of top deck (E) until
top deck (E) is standing on end (F).
Go on to Sheet 2
TA140638