TM
5-5420-226-20-1
Symptom-42
DETAILED
TROUBLESHOOTING
PROCEDURE
.T
INDICATOR
- LAMP
(Continued)
Check
basket-indicator
panel
harness
(CKT 509L)
at
connector
to powerplant
warning
light for short to
ground.
Second
Technician
(Operators
Station)
l Disconnect
basket-indicator
panel
harness
connector
from
gage instrument
panel.
l Displace
master
control
panel (page
10-33).
.
l Disconnect
basket-control
panel
accessories
harness
connector
(CKT
27) from
master
control
panel.
l Disconnect
basket-indicator
panel
harness
connector
(CKT
509L) from powerplant
warning
light assembly.
l Connect
red probe
of me[er
to one of the contacts
in
basket-indicator
panel
harness
connector
(CKT
509L)
and black
probe
to ground.
l Check if meteroindicates
continuity.
l Repeat check moving red probe of meter to other
contact
in basket-indicator
panel
harness
connector,
Does meter
indicate
continuity
during
either
check,
thereby
indicating
a short?
n
C?E-i
. ..-
u
/j.&
POWERPLANT
WARNING
LIGHT
)
l Replace
powerplant
warning
lamp socket
(page
10-189).
l Connect
basket-control
panel
accessories
harness
connector
to master
control
panel.
l Install master
control
panel
(page
10-33).
l Connect
basket-indicator
panel
harness
connector
to
gage
instrument
panel.
l Connect
engine
electrical
harness
connector
(CKT
509L)
to engine
low oil
pressure
switch.
l Install engine access cover
(page
17-18).
l Instaii transmission
shroud
(page
9-6).
TA107193
4-504
.
