TM 9-2350-222-20-1-4
SHIFT LINKAGE ADJUSTMENT (Sheet 19 of 20)
145. Using 9/16 inch wrench, adjust shifting rod
bearing end (BW) by turning clockwise or
counterclockwise until screw (BV) drops freely
through clevis (BX) and shifting rod bearing
end (BW).
146. Using 9/16 inch wrench, install screw (BV)
through clevis (BX) and shifting rod bearing
end (BW).
147. Using crowfoot and torque wrenches, tighten
jamnut (BU) to 15-20 lb-ft (20-27 N.m).
148. Remove locating pin from alinement hole (C).
149. Using 9/16 inch socket and torque wrench, tighten screw (BV) to 15-20 lb-ft (20-27 N.m) and go to
step 160.
150. Using 9/16 inch wrench, remove screw (BV) and shifting rod bearing end (BW) from clevis (BX).
151. Using 9/16 inch wrench, adjust shifting rod bearing end (BW) by turning clockwise until shifting rod
(BQ) is past hole (BS).
152. Using 9/16 inch wrench, install screw (BV) through clevis (BX) and shifting rod bearing end (BW).
153. Using crowfoot and torque wrenches, tighten jamnut (BU) to 15-20 lb-ft (20-27 N.m).
154. Using 9/16 inch socket and
torque wrench, tighten screw (BV) to
15-20 lb-ft (20-27 N.m).
TA253377
Go on to Sheet 20
11-20 Change 1