TM 9-2350-222-20-14
SHIFT LINKAGE ADJUSTMENT (Sheet 18 of 20)
135. Using small diameter wire (Item 59, Appendix
D), check to see if shifting rod (BQ) is past
holes (BR) and (BS). If shifting rod (BQ) is
past holes (BR) and (BS), do steps 136 thru
139. If shifting rod (BQ) is not past hole (BR),
do steps 140 thru 149. If shifting rod (BQ) is
not past hole (BS), go to step 150.
136. Using 9/16 inch wrench, install screw (F)
through clevis (H) and shifting rod bearing
end (G).
137. Using crowfoot and torque wrenches, tighten
jamnuts (BT) and (BU) to 15-20 lb-ft (20- 27
N.m).
I
138. Remove locating pin from alinement hole (C).
139. Using 9/16 inch socket and torque wrench,
tighten screw (F) to 15-20 lb-ft (20-27 N.m)
and go to step 160,
140. Using 9/16 inch wrench, adjust shifting rod bearing end (G) by turning clockwise until shifting rod
(BQ) is past hole (BR).
141. Using 9/16 inch wrench, remove screw (BV) and remove shifting rod bearing end (BW) from clevis
(BX).
142. Using 9/16 inch wrench, install screw (F) through clevis (H) and shifting rod bearing end (G).
143. Using crowfoot and torque wrenches, tighten jamnut (BT) to 15-20 lb-ft (20-27 N.m).
144. Using 9/16 inch socket and torque wrench, tighten screw (F) to 15-20 lb-ft (20-27 N.m).
Go on to Sheet 19
TA253376
Change 1 11-19