TM 9-2350-222-20-1-4
SHIFT LINKAGE ADJUSTMENT (Sheet 15 of 20)
109. Using two 9/16 inch wrenches, loosen jamnut
(BF).
110. Using 9/16 inch wrench, adjust stud and rod
end bearing assembly by turning rod bearing
end (BG) clockwise or counterclockwise until
distance between centers of rod bearing (BG)
and (BH) measures 5-3/4 inches.
111. Using small diameter wire (Item 59, Appendix D), check to see if rod (BJ) is past holes (BK) and (BL).
If rod (BJ) is past holes (BK) and (BL), go on to step 112. If rod (BJ) is not past hole (BK), do steps
113 thru 117. If rod (BJ) is not past hole (BL), go on to step 118
112. Using 9/16 inch wrench, crowfoot wrench, and torque wrench, tighten jamnut (BF) to 15-20 lb-ft
(20-27 N.m) while maintaining 5-3/4 inch measurement and go to step 123.
113. Using 9/16 inch wrench, turn rod bearing end (BG) clockwise until rod (BJ) is past hole (BK).
114. Using 9/16 inch wrench, crowfoot wrench, and torque wrench, tighten jamnut (BF) to 15-20 lb-ft
(20-27 N.m).
115. Using two 9/16 inch wrenches, loosen jamnut (BM).
116. Using 9/16 inch wrench, adjust stud and rod end bearing assembly by turning rod bearing end (BH)
clockwise or counterclockwise until distance between centers of rod bearing ends (BG) and (BH)
measures 5-3/4 inches.
117. Using 9/16 inch wrench, crowfoot wrench, and torque wrench, tighten jamnut (BM) to 15-20 lb-ft
(20-27 N.m) while maintaining 5-3/4 inch measurement and go to step 123.
TA253374
Go on to Sheet 16
11-16 Change 1