TM 9-2350-222-20-1-3
TRANSMISSION SHROUDS REPLACEMENT (Sheet 5 of 8)
Right Intermediate Shroud Replacement (Sheet 5 of 5)
Install cable assembly (E) through intermediate
5.
shroud (A).
6.
7.
Using spanner wrench, connect cable assembly (E) connector to generator (F) connector.
Install grommet (G) around cable assembly (E) and into intermediate shroud (A).
Install 2A powerplant (page 5-14) or 2D powerplant (page 5-37).
9.
TA140277
End of Task
9-43