TM 9-2350-222-34-1
6. Install two new connecting gaskets (E).
7. Attach connectors (C) to base (D) and solder.
8. Install eight screws (A) and eight new lock washers
(B) to base.
TESTING:
1. Leakage Test.
a. Remove screw from test port (P).
b. Using a 1/8-inch pipe thread fitting, connect an
air source and pressure gage to test port (P).
CAUTION
Do not exceed 6 psi pressure to test
port and submerge power supply in
water. If bubbles are present, repair
leak and retest.
c.
Apply 6 psi pressure to test port (P) and sub-
merge power supply in water. If bubbles are
present, repair leak and retest.
d. Dry power supply with compressed air, re-move
fitting from test port (P). and install test port
screw.
Change 4 5-96