TM 9-2350-222-34-1
ACCELERATOR CONNECTING LINK (RISER) AND (LOWER) TUBE ASSEMBLY REPLACEMENT (Sheet 4 of 4)
9. Aline connecting link rod end (P) with clevis of lever
(Q).
10. Using wrench, install bolt through lever clevis (Q)
and connecting link bearing rod end (P).
11. Carefully position new seal (S) in cover (T).
12. Position cover (T) and seal (S) on riser housing (U)
with all holes alined.
13. Using socket, install four screws (V) and washers
(W) in cover (T) and riser housing (U).
End of Task
TA130564
4-106