TM 9-2360-222-34-1
FUEL PRIMER INLET (TEE-TO-BULKHEAD) TUBE ASEMBLY PLACEMENT (LATE MODEL)
(Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Inspection
Installation
TOOLS:
9/16 in. combination box and open end wrench
5/8 in. combination box and open end wrench
7/16 in. socket with in. drive
11/16 in. combination box and open end wrench (2 required)
SUPPLIES:
Lockwasher (MS35338-44) (2 required)
PRELIMINARY PROCEDURE: Remove left fuel tank (page 4-51)
Go on to Sheet 2
TA252612
Change 1 4-84.3