TM 9-2350-222-20-2-3-2
FLEXIBLE CHUTE REMOVAL PROCEDURE (CONT)
36-80.
FRAME 2
Procedure
Squeeze two locking pins (1) in toward middle of flexible chute (2) and place pins in
1.
locked position.
Apply even pressure to flexible chute (2) and push up enough to free flexible chute from
2.
two tabs (3) that hold chute to ammunition track (4).
END OF TASK
Para 36-80 Cont
36-178