TM 9-2350-222-20-2-3-2
36-80. FLEXIBLE CHUTE REMOVAL PROCEDURE (CONT)
FRAME 1
Procedure
Step
Squeeze two locking pins (1) in toward middle of flexible chute (2) and place pins in
1.
locked position.
2.
Apply even pressure to flexible chute (2) and pull down enough to clear two tabs (3)
that hold flexible chute to fixed chute (4).
GO TO FRAME 2
Para 36-80 Cont
36-177