Home
Download PDF
Order CD-ROM
Order in Print
PAD REMOVAL PROCEDURE - TM-9-2350-222-20-2-3-20529
FRAME 1 - TM-9-2350-222-20-2-3-20531
TM-9-2350-222-20-2-3-2 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Page Navigation
479
480
481
482
483
484
485
486
487
488
489
TM
9-2350-222-20-2-3-2
36-79.
PAD
INSTALLATION
PROCEDURE
TOOLS:
Wire
brush
Paint
brush
SUPPLIES:
New
pad
Adhesive
(item
1,
App.
A)
Clean
cloth
(item
15,
App.
A)
PERSONNEL:
One
EQUIPMENT
LOCATION
INFORMATION:
CALLOUT
FOLDOUT
EQUIPMENT
FO-3
11
Driver's
Master
Control
Panel
EQUIPMENT
CONDITION:
Driver's
master
control
panel
MASTER
BATTERY
switch
set
to
OFF
Para
36-79
36-174
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business