TM 9-2350-222-20-2-3-2
CRADLE INSTALLATION PROCEDURE (CONT)
36-10.
FRAME 3
Procedure
Step
1.
Soldier A: Hold cradle (1) at elevated position (TM-10).
2.
Soldier B: Block cradle in this position with wooden block (2).
NOTE
When installing worm gear (3) make sure that flat side of eye faces
head of mounting bolt (4). The other side is notched and is used to
hold spring (7).
Soldier A: Do steps 3 through 6.
3.
Hold elevation screw jack and worm gear (3) in place and put mounting screw (4) through flat washer
(5), cradle (6), and worm gear (3).
4.
Using 3/4 in. wrench, put in spring (7), flat washer (8), and new self-locking nut (9).
5.