TM 9-2350-222-20-2-3-2
BREECH OPERATING MECHANISM INSTALLATION PROCEDURE (CONT)
32-4.
PROCEDURE
STEP
Line threaded pin hole (1) on aduster (2) up with detent hole (3).
1.
2.
Push adjuster (2) on spring stack (4).
3.
Line up pin hole of adjuster (2) with pin hole on spring stack (4).
NOTE
Head of pin (5) should be screwed in below surface of adjuster (2).
Using screwdriver, install threaded Pin (5) in adjuster (2).
4.
Using screwdriver, install two detente (6).
5.
6.
Using adjustable wrench, tighten two nuts (7) on two detents (6).
NOTE
Follows Maintenance Action Required:
Adjust breech closing swing (TM-10).
Install breechblock group (TM-10).
model only)
END OF TASK
Para 32-4 Cont
Change 1 32-11