TM 9-2350-222-20-2-3-2
BREECH OPERATING MECHANISM INSTALLATION PROCEDURE (CONT)
32-4.
Procedure
Step
Place spring (1) and plunger (2) inside breechring (3).
1.
Pull handle (4) and crank arms (5) down so pin hole in spring stack (6) is lined up
2.
with detent hole (7).
GO TO FRAME 4
Para 32-4 Cont
32-10