CONNECTING LINK REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
Position washer (A) and connecting link (B) onto shaft (C).
1.
2.
Position connecting rod (D) onto clevis of connecting link (B) and secure with bolt (E).
3.
InstalI connecting rod (F) onto connecting link (B) and secure with bolt (G).
4.
Using 9/16 inch socket and torque wrenches, tighten bolts (E) and (G) to 15-20 lb-ft (2027 N-m).
5.
Install washer (H) and shield (J) onto shaft (C) and, using 7/16 inch socket and extension, install
and secure washer (K) and screw (L) into shield (J).
6.
Using wrench, install and secure washer (M) and nut (N).
Using pliers, install new cotter pin (P).
7.
8.
Install 2A powerplant (page 5-14) or 2D powerplant (page 5-37).
End of Task