TM 9-2350- 222-20-1-3
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 23 of 23)
58. If engine, transmission, or accelerator control linkage was replaced. check accelerator control
59. Install upper engine access cover (page 16-40).
60. Install right angle drive, pump, and clutch (page 18-104).
61. Connect battery ground straps (page 10-283),
63. Install top deck (page 16-23).
64. Remove blocks from both tracks at front and rear.
65. Perform operational test (TM 9-2350-222-10).
End of Task
5-47