TM
5-5420-226-20-1
Symptom-40
DETAILED
TROUBLESHOOTING
PROCEDURE
T
INDICATOR
- GAGE
(Continued)
m
Check gage circuit breaker
in master control panel for
continuity.
technician
(Operators
Station)
l Connect
basket-indicator
panel
harness
connector
to
gage instrument
panel.
l Install gage instrument
panel
(page
10-112).
l Remove 4 screws, nuts and washers
from
master
control
panel
accessories
harness
connector
and
displace
connector
from
master
control
panel.
l Disconnect
two electrical
leads
(CKT
27) from
gage
circuit
breaker
on master
control
panel.
l Connect
one meter
probe
to each
circuit
breaker
contact.
l Check if meter indicates
continuity.
l
Does meter
indicate
continuity?
n
o-
T
+0
I
(page
10-70).
.
Connect
basket-control
TA107181
4-492