TM 5-5420-226-20-1
.-
Symptom-1
DETAILED
TROUBLESHOOTING
PROCEDURE
VEHICLE
OPERATION
- POWERPLANT,
STARTING
(Continued)
.
I
Check
at master
control
panel accessories
harness
connector
(CKT 14) for electrical
power.
First
Technician
(Operators
Station)
l Set MASTER
BATTERY
switch
OFF.
Second
Technician
(Commanders
Sta[ion)
l Install front accessory harness connector
at bulkhead
disconnect
(page
10-270).
l Install btisket-control
panel accessories
harness
connector
at basket disconnect
(page
10-270).
First
Technician
(Operators
Station)
l Displace master control
panel
(page
10-33).
l Disconnect
basket-control
panel accessories
harness
connector
(CKT
14) at master
control
panel,
l Connect
red probe of meter
to contact
J (CKT
14) of
master control
panel accessories
harness
connector
and
black probe to ground.
l Set MASTER
BATTERY
switch
ON.
l Press and release STARTER
switch,
l Check if meter indicates
18 to 30 volts dc when starter
switch
is pressed.
Does meter
indicate
18 to 30 volts dc?
\
m
0-
11
+
0
II
TO VEHICLE
GROUND
OA
OE or)
CONTACT
J
F
Ou OC
(CKT 14)
ON
OL
o
oK oB
OJ OA
W5
w
MASTER
CONTROL
PANEL
(REAR
VIEW)
)
l Inspect
basket-control
panel
accessories
harness
for bent/
broken
connector
contacts
or
loose CKT 14 wire at rear of
connectors.
l Repair connectors
if defective
(page
10-298).
l If connectors
are not
defective,
notify
support
maintenance
of a defective
basket-control
panel
accessories
harness.
l Connect
basket-control
panel
accessories
harness
connector
to master
control
panel.
l Install master control
panel
(page
10-33).
CONTACT
TA1068OO
4-111
