TM 9-2350-222-34-1
SLAVE RECEPTACLES AND RELAY LEAD ASSEMBLY REPLACEMENT (2D ENGINE) (Sheet 1 of 7)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS:
7/16 inch socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
9/16 in. combination box and open end wrench (2 required)
Spanner wrench
Slip joint pliers
REFERENCES:
TM 9-2350-222-20-1
TM 9-2350-222-34-2
PRELIMINARY PROCEDURES:
Remove turret (TM 9-2350-222-34-2)
REMOVAL:
1. Lift up boots (A) on three positive ( + ) battery
terminals. Slide boots up cables (B) to expose
battery terminal connections.
2. Using two 9/16 inch wrenches, remove three nuts
(C) and washers (D). Remove cables (B) from bolts
(E).
3. Slide boots (A) off cables (B). Keep boots.
Go on to Sheet 2
TA130621
5-42