TM 9-2350-222-20-1-4
MASTER CONTROL PANEL REPAIR (Sheet 30 of 65)
Circuit Breaker Replacement (Sheet 1 of 7)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal (bilge pump and gas particulate, IR power/Night Vision, fuel
shutoff, and utility outlet circuit breakers)
Installation (bilge pump and gas particulate, IR power /Night Vision
fuel shutoff, and utility outlet circuit breakers)
Removal (fuel pump circuit breaker)
Installation (fuel pump circuit breaker)
Removal (gage circuit breaker)
Installation (gage circuit breaker)
Removal (manifold preheat circuit breaker)
Installation (manifold preheat circuit breaker)
TOOLS: 3/8 in. socket with 1/2 in. drive
Long round nose pliers
6 in. cross-tip screwdriver
11/32 in. combination box and open end wrench
SUPPLIES: Silicone compound (Item 32, Appendix D)
Lockwasher (MS35338-42) (13 required)
PRELIMINARY
PROCEDURE:
Go on to Sheet 2
TA253223
10-84
Change 1