TM 9-2350-222-341
SLAVE RECEPTACLE AND RELAY LEAD HARNESS ASSEMBLY REPLACEMENT (LATE MODEL)
(Sheet 1 of 7)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS:
7/16 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
9/16 in. combination box and open end wrench (2 required)
Spanner wrench
Slip joint pliers
Offset cross-tip screwdriver
9/16 in. socket with 1/2 in. drive
Lockwasher (MS35338-42) (6 required)
PRELIMINARY PROCEDURES:
Disconnect battery ground strap (TM 9-2350-222-20-1)
Go on to Sheet 2
Change 1 (5-48.1 blank)/5-48.2