TM 9-2350-222-34-1
ENGINE REPLACEMENT (2D ENGINE) (Sheet 1 of 18)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Cleaning
Installation
TOOLS:
3/4 in. combination box and open end
7/16 in. combination box and open end
wrench
wrench (2 required)
1-3/16 in. open end wrench
7/8 in. combination box and open end
5/8 in. combination box and open end
wrench
wrench
1 in. combination box and open end
1-1/8 in socket with 1/2 in. drive
wrench
5 in. extension with 1/2 in. drive
1-1/8 in. open end wrench
Flat-tip screwdriver
1-1/2 in. open end wrench
Spanner wrench
1-5/8 in. open end wrench
Retaining ring pliers
1/2 in. socket with 1/2 in
drive. Torque wrench with 1/2 in. drive (0-175 1b-
1/2 in. combination box and open end
ft) (0-237 N.m)
wrench
5/8 in. socket with 1/2 in drive
Transmission sling (7081593)
Puller attachment (7082201)
SPECIAL TOOLS: Pinion turning wrench (Item 5, Chapter 2, Section I) Engine and transmission sling (Item 1,
FABRICATED TOOLS:
SUPPLIES:
Gasket (10864007)
Preformed packing (7723892)
Wooden blocks, 10 x 10 x 12 in.
Drain pan
(2 required)
I.D. tags
Dry cleaning solvent (Item 12,
Gasket (7767860)
REFERENCES:
TM 9-2350-222-20-1
LO 9-2350-222-12
PERSONNEL: Two
PRELIMINARY PROCEDURES:
Remove steering linkage and brackets (TM 9-2350222-20-1)
Remove shifting linkage and brackets (TM 9-2350-222-20-1)
Remove engine shroud and supports (TM 9-2350-22220-1)
Remove engine mounts (IM 9-2350-22220-1)
Remove right angle drive, clutch, and pump (TM 9-2350-222-20-1)
Go on to Sheet 2
All data on pages 3-2 thru 3-17 deleted.
Change 5 3-18