Home
Download PDF
Order CD-ROM
Order in Print
Schematic Drawing - TM-9-2350-222-20-2-3-20519
ELEVATION SCREW JACK HANDLE SWITCH INSTALLATION PROCEDURE
TM-9-2350-222-20-2-3-2 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Page Navigation
469
470
471
472
473
474
475
476
477
478
479
TM
9-2350-222-20-2
-3-2
36-73.
ELEVATION
SCREW
JACK
HANDLE
SWITCH
REMOVAL
PROCEDURE
TOOLS:
Flat
tip
screwdriver
PERSONNEL:
One
PRELIMINARY
PROCEDURES:
Remove
elevation
screw
jack
handle
(para
36-71)
FRAME
1
Procedure
Step
1.
Using
screwdriver,
remove
two
screws
(l).
Remove
cap
(2).
2.
Electrical
leads
(3)
have to be
pulled
through
screw
jack
handle
(4)
one
at a
time.
Remove
screw
jack
handle
switch
(5)
and
electrical
leads
(3)
from
screw
jack
handle
3.
(4).
END
OF
TASK
Para
36-73
36-164
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business