TM 9-2350-222-20-2-3-2
CUPOLA POWER SWITCH INSTALLATION PROCEDURE (CONT)
36-22.
PROCEDURE
NOTE
C h e c k that mark with masking tape made at removal (para
36-21) to
show upright position of
switch (4) is on
top.
1.
Connect electrical connector (1) of circuit 11lC to switch terminal 2 (JPG).
Connect electrical connector (2) of circuit lllB to switch terminal 3 (JPG).
2.
Connect electrical connector (3) of circuit 111 to switch terminal 1 (JPG).
3.
4.
Place switch (4) in mounting position against back of panel (5).
Using screwdriver, put two screws (6) with two lockwashers (7) through panel (5) and into switch (4).
5.
END OF TASK
Para 36-22 Cont
Change 1 36-57