TM 9-2350-222-20-2-3-2
30-5.
HOLD-OPEN MECHANISM INSTALLATION PROCEDURE (CONT)
FRAME 2
STEP
PROCEDURE
1.
Put sealing compound on screw (1) (JPG).
NOTE
Center of clip opening must be lined up with lock handle of
hold-open mechanism.
2.
Using screwdriver, attach spring clip (2) to hatch (3) with two screws (1) and two lockwashers (4).
3.
Close hatch (3).
END OF TASK
Para 30-5 Cont
30-16 Change 1