TM 9-2350-222-20-2-3-2
28-7.
165-MM AMMUNITION RETAINING CLAMPS INSTALLATION PROCEDURE
(CONT)
Step
Procedure
1.
Using socket and combination wrenches, attach ammunition retaining clamps plate (1) to
support (2) with two screws (3), two lockwashers (4) and two nuts (5).
NOTE
Follow-on Maintenance Action Required:
Install six round or three round ammunition rack as
END OF TASK
Para 28-7 Cont
2 8 - 1 5 / ( 2 8 - 1 6 blank)