TM 9-2350-222-20-1-5
SMOKE GENERATOR SOLENOID REPLACEMENT (Sheet 4 of 5)
Lightly coat threads of nipple (A) with oil (Item
2.
3.
Using 5/8 inch wrench, install nipple (A) into
input port of one solenoid (B) and into outlet
port of the other solenoid (B).
Tighten valves securely onto nipple and adjust
4.
valves (B) so their bottoms are even with each
other.
5.
Lightly coat threads of 90-degree elbow (C) and 45-degree elbow (D) with oil.
6.
Holding solenoids (B) and nipple (A) assembly in your hand with connector facing toward you,
install 90-degree elbow (C) into inlet port of the solenoid (B) on your right. Tighten 90-degree
elbow (C) to the approximate one o'clock position.
Install 45-degree elbow (D) into outlet port of the solenoid on your left. Tighten 45-degree elbow
7.
(D) to the approximate eight o'clock position.
8.
Position assembled solenoids (B) and fittings onto bracket (E) with connectors facing to the left as
shown .
9.
Using 5/16 inch wrench, install and tighten four assembled screws (F) and flat washers (G) to
secure solenoids (B) to bracket (E).
Go on to Sheet 5
TA140886
23-34