TM 9-2350-222-20-1-5
TOWING PINTLE REPAIR (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Disassembly
Cleaning and Inspection
Assembly
Installation
TOOLS:
1-5/16 in. open end wrench
3-1/4 in. socket with 1 in. drive
Hammer
Long round nose pliers
1-1/2 in. socket with 3/4 in. drive
Flat-tip screwdriver
1-5/16 in. socket with 3/4 in. drive
Center punch
8 in. extension with 3/4 in. drive
3/8 in. drive punch
59-62 in. pinchpoint crowbar
1-1/2 in. open end wrench
Cotter pins (MS24665-359) (2 required)
Lockwasher (MS35338-52) (4 required)
PERSONNEL: Two
REMOVAL:
1.
Holding nuts (A) with 1-5/16 inch wrench and
using 1-5/16 inch socket, remove four bolts (B),
Remove towing pintle (D) from vehicle.
2.
Go onto Sheet 2