TM 9-2350-222-20-1-4
FINAL DRIVE (LEFT AND RIGHT) REPLACEMENT (Sheet 1 of 6)
PROCEDURE INDEX
PAGE
PROCEDURE
I
Removal
Installation
6 in. adjustable wrench
TOOLS:
8 in. extension with 3/4 in. drive
Universal joint with 3/4 in. drive
Hoist (capable of 1100 lbs minimum capacity)
Pinch bar
Socket wrench handle with 3/4 in. drive
1-1/2 in. socket with 3/4 in. drive
Torque wrench with 3/4 in. drive (0-600 lb-ft) (0-813 N-m)
Torque wrench with 3/8 in. drive (0-200 lb-in) (0-23 N.m)
36 in. extension bar (cheater bar)
Knife, putty
9/16 in. combination box and open end wrench
9/16 in. crowfoot wrench with 3/8 in. drive
SUPPLIES:
Sealing compound (Item 27, Appendix D)
Oil (Item 43, Appendix D)
1-1/2 in. locknuts (34 required)
Small brush (Item 10, Appendix D)
Dry cleaning solvent (Item 54, Appendix D)
Rags (Item 65, Appendix D)
PERSONNEL: TWO
REFERENCES:
TM 9-2350-222-10
LO 9-2350-222-12
PRELIMINARY PROCEDURES:
Drain oil from final drive (LO 9-2350-222-12)
Go on to Sheet 2
12-2 Change 5