TM9-2350-222-20-1-3
FUEL SHUTOFF CABLE MOUNTING BRACKET REPLACEMENT (LATE MODEL) (Sheet 4 of 6)
INSTALLATION:
1.
Position bracket (A) and gas particulate air
heater hose bracket (B) to mounting bosses on
reservoir.
2.
Using 7/16 inch socket and 7/16 inch wrench,
secure brackets (A) and (B) to reservoir with
3.
Install grommet (D) in lower hole of brac-
ket (A).
4.
Thread cable (E) through grommet (D) in
lower hole of mounting bracket (A).
As you thread cable (E) through grommet,
5.
install three nuts (F), new Iockwashers (G),
and hinge (H) onto cable (E) and continue
threading cable through top hole in mount-
ing bracket (A).
6.
Install new lockwasher (J) and nut (K) onto
cable (E).
TA253285
Go on to Sheet 5
Change 1 7-212.3